Plaza 33 has installed Photovoltaic Panels on our rooftop to generate renewable energy for building consumption.
Plaza 33 has applied for the GET (Green Electric Tariff), pending the availability of quotes from TNB.
Plaza 33 is committed to the reduction of our carbon footprint.
Plaza 33 uses sustainable and Green Certified products.
Provision of electrical vehicle charging stations for public use.
Promote the use of public transport and carpooling. In house valet to assist motorists to locate and parking their vehicles.
Companies rely on reliable information systems to run their operations, and thus need data centres to house their computer systems and associated components. To ensure that these data centres have sufficient dual source electricity supply, Plaza33 is designed with excess electrical power up to 5MW. The floor loading is 7kPa and floor to ceiling height is 4.2 metres. The data centre space is located on Level 9, 10 and 11 in Tower B on a total area of 52,000 sq. ft.
Specially designed to support the growing Information and Computer Technology (ICT) requirements of Corporate Malaysia, the highest specifications have been incorporated to make Plaza33 a truly class “A” corporate office building with HQ potential and a much desired address.
Plaza33 holds great appeal for discerning corporations looking to set up office or headquarters in Petaling Jaya’s new Central Business District (CBD). This development is specifically built to the highest specifications to fulfil the most demanding design, IT and power supply needs of today’s technology-powered corporations.
Plaza 33, No. 1, Jalan Kemajuan,
Seksyen 13, 46200 Petaling Jaya,
Selangor Darul Ehsan, Malaysia
Website Design by WDD Malaysia